One Schedule. One Manager. One Warranty Path.

When a project spans roofing, siding, windows, gutters, and more, the hard part isn't any single trade — it's the coordination between them. One project manager owns the schedule, the sequence, the inspections, and the communication, so the seams between trades aren't where things fail.

Free inspection & photo report · Fixed, line-item bids· Written workmanship warranty

Signs to watch

Is this you?

Every trade is a separate phone number

Roofer, siding crew, window installer, gutter company — four schedules that don't talk, four warranties that point at each other when something leaks at the seam between them.

The failures live where the trades meet

Roof-to-wall flashing, window-to-housewrap sealing, gutter-to-drip-edge fit. No single trade owns those intersections, which is exactly why they're where water gets in. Someone has to own the whole envelope.

Nobody can tell you what's happening this week

When five subs run their own calendars, the schedule is a rumor. One project manager who owns the whole sequence can actually tell you what's happening today, next, and why.

Change orders turn into a blame game

Open a wall, find rot, and suddenly three trades are renegotiating and none of them are responsible for the delay. One manager absorbs the change, re-sequences, and keeps one clock running.

Your options

One name accountable for the whole envelope

The building envelope is one system, but it's built by many trades — and the coordination between them is where most exterior projects go sideways. Multi-trade project management puts one person in charge of the whole thing: one schedule that sequences the trades in the right order, one point of contact who actually knows what's happening today, one set of inspections coordinated so the project doesn't stall waiting on a sign-off, and one warranty path so you're never caught between contractors blaming each other for a leak at the seam. We manage materials so the siding is on-site when the crew is, handle change orders as one clock instead of a renegotiation, and keep communication flowing in one direction — to you — instead of making you the messenger between trades. When the same company that manages the sequence also carries the warranty, there's no seam to point across.

The method

How we do it

  1. 01

    Sequence and schedule

    One master schedule that orders the trades correctly — roof before siding, windows with the weather barrier, gutters last — with materials staged to arrive when each crew does.

  2. 02

    Manage the build

    One project manager runs the day-to-day: coordinating inspections so the job doesn't stall, absorbing change orders into a single clock, and being the one number you call for a straight answer.

  3. 03

    One warranty path, one walkthrough

    Every trade ties back to one accountable company and one final walkthrough — so a problem at any seam has one owner, not a finger-pointing contest between subs.

Straight numbers

What coordinated management is worth

Managing a multi-trade exterior as one project isn't a line item you pay extra for — it's how the whole job costs less and finishes cleaner. One mobilization instead of four, one dumpster cycle, one schedule that doesn't leave crews waiting on each other, and change orders absorbed by one manager instead of renegotiated three ways: those are real savings, and they show up as fewer delays and fewer surprises rather than a coordination fee. The larger and more trade-crossed your project is, the more the single-manager structure earns its keep — because the cost of bad coordination is measured in leaks at the seams and warranties nobody will honor, not in the invoice.

Where we do this work

Multi-Trade Exterior Project Management: straight answers

Why does one project manager matter if the trades are all good at their jobs?

Because the failures on an exterior aren't usually inside a trade — they're between trades, at the flashing and sealing intersections no single crew owns. A great roofer and a great siding crew can still leak at the seam where their work meets if nobody sequenced and coordinated that handoff. One manager owns those seams.

What does 'one warranty path' actually mean for me?

It means when something goes wrong, there's one company responsible — not a standoff where the roofer blames the siding crew and the siding crew blames the window installer while your ceiling stains. Every trade on the project ties back to one accountable name, so you make one call, not four.

How are change orders handled when something unexpected comes up?

As one clock. When we open a wall and find rot, or an inspection turns up something, the project manager scopes the change, re-sequences the trades around it, and brings you one documented change order to approve — instead of three separate subs renegotiating while the schedule slips and no one owns the delay.

Do you self-perform the trades or subcontract them?

It varies by scope — the point of coordinated management isn't who holds the tools, it's who holds the accountability. Whether a trade is self-performed or run by a coordinated crew, it answers to one schedule, one project manager, and one warranty path. You get a single owner for the whole envelope either way.

Get the multi-trade exterior project management conversation started.

Free 20-minute inspection. Photo report you keep either way. Zero pressure.